# Variation order video template

> A variation / change order sheet: reference and contract numbers, the description of change, who instructed it, a counting cost impact and time impact, the revised contract sum and completion date, two signatures and a green APPROVED stamp that slams on. Fill in your own variation.

- Page: https://cutluma.com/templates/cn2-change-order
- Use it (free account): https://cutluma.com/editor?guest=1&tpl=cn2-change-order
- Format: 4:5 (portrait), 1080×1350, 11 seconds, animated
- Category: Construction
- Keywords: construction, variation order, change order, contract, cost impact, approval, quantity surveyor, form
- Language: English
- Every line of text is editable; add your own clips, photos and music; export MP4 in HD.

## More Construction templates

- [Build progress](https://cutluma.com/templates/cn-progress-tracker) — 9:16, 10 s, Construction: A phase stepper over your site footage: Foundation → Framing → Roof → Finishes with done phases ticked and the current one pulsing yellow, then a glass card where the percent counts up and a bar fills. Change the phases, the week and the percentage.
- [Caution tape hook](https://cutluma.com/templates/cn-caution-tape) — 9:16, 8 s, Construction: Yellow caution tape runs across your footage with CAUTION and DO NOT CROSS tickers, hazard stripes and a hard shadow while WATCH THIS / BEFORE / YOU BUILD slams in line by line. A hook for any building, renovation or trade tip.
- [PPE checklist](https://cutluma.com/templates/cn-ppe-checklist) — 9:16, 9 s, Construction: SAFETY FIRST in tall yellow caps, then four white cards slide in — hard hat, steel-toe boots, hi-vis, gloves — each with line-art drawn on and a yellow tick that checks itself, ending on GOOD TO GO. Swap the items for your site rules.
- [Site stats](https://cutluma.com/templates/cn-site-stats) — 9:16, 10 s, Construction: Three frosted cards over your site footage with huge condensed numbers that count up: days without an incident, cubic metres poured, crew on site. Edit the numbers and labels for your weekly report.
- [Blueprint reveal](https://cutluma.com/templates/cn-blueprint-reveal) — 9:16, 10 s, Construction: A drawing sheet on cobalt dot-grid paper: project title in heavy Archivo, dimension lines that draw themselves with measurements, a north arrow, a title block with client and sheet number and a frame for your render or site photo (an elevation outline until filled). Edit the title block.
- [Time-lapse stamp](https://cutluma.com/templates/cn-timelapse-stamp) — 16:9, 10 s, Construction: A REC-style overlay for site time-lapses: corner brackets, blinking REC, a date that ticks week by week, a yellow WEEK 12 / 40 badge that counts along, project name and a progress bar along the bottom. Set the dates and the week count.
- [Now hiring trades](https://cutluma.com/templates/cn-now-hiring) — 1:1, 9 s, Construction: A safety-yellow hiring post: NOW HIRING in tall Bebas, three trades with hourly rates that count up on dashed rules, a tilted crew photo with an APPLY TODAY burst and a "DM us" pill. Edit the trades, rates and number.
- [Materials receipt](https://cutluma.com/templates/cn-materials-list) — 4:5, 10 s, Construction: A till receipt on concrete grey: job number, seven material lines with quantities and prices that count up, subtotal, delivery and a big total, a barcode and a red ORDERED stamp. Swap in your own order.
