# RFI tracker board video template

> A query board in three columns, open, answered and closed: each RFI is a card with its number and age, one carries the site photo that went with the question, and one card slides from open to answered while the totals count. Retype the queries and statuses.

- Page: https://cutluma.com/templates/cn3-rfi-tracker
- Use it (free account): https://cutluma.com/editor?guest=1&tpl=cn3-rfi-tracker
- Format: 16:9 (landscape), 1920×1080, 11 seconds, animated
- Category: Construction
- Keywords: construction, rfi, query tracker, kanban, request for information, designer, status board, site manager
- Language: English
- Every line of text is editable; add your own clips, photos and music; export MP4 in HD.

## More Construction templates

- [Build progress](https://cutluma.com/templates/cn-progress-tracker) — 9:16, 10 s, Construction: A phase stepper over your site footage: Foundation → Framing → Roof → Finishes with done phases ticked and the current one pulsing yellow, then a glass card where the percent counts up and a bar fills. Change the phases, the week and the percentage.
- [Caution tape hook](https://cutluma.com/templates/cn-caution-tape) — 9:16, 8 s, Construction: Yellow caution tape runs across your footage with CAUTION and DO NOT CROSS tickers, hazard stripes and a hard shadow while WATCH THIS / BEFORE / YOU BUILD slams in line by line. A hook for any building, renovation or trade tip.
- [PPE checklist](https://cutluma.com/templates/cn-ppe-checklist) — 9:16, 9 s, Construction: SAFETY FIRST in tall yellow caps, then four white cards slide in — hard hat, steel-toe boots, hi-vis, gloves — each with line-art drawn on and a yellow tick that checks itself, ending on GOOD TO GO. Swap the items for your site rules.
- [Site stats](https://cutluma.com/templates/cn-site-stats) — 9:16, 10 s, Construction: Three frosted cards over your site footage with huge condensed numbers that count up: days without an incident, cubic metres poured, crew on site. Edit the numbers and labels for your weekly report.
- [Blueprint reveal](https://cutluma.com/templates/cn-blueprint-reveal) — 9:16, 10 s, Construction: A drawing sheet on cobalt dot-grid paper: project title in heavy Archivo, dimension lines that draw themselves with measurements, a north arrow, a title block with client and sheet number and a frame for your render or site photo (an elevation outline until filled). Edit the title block.
- [Time-lapse stamp](https://cutluma.com/templates/cn-timelapse-stamp) — 16:9, 10 s, Construction: A REC-style overlay for site time-lapses: corner brackets, blinking REC, a date that ticks week by week, a yellow WEEK 12 / 40 badge that counts along, project name and a progress bar along the bottom. Set the dates and the week count.
- [Now hiring trades](https://cutluma.com/templates/cn-now-hiring) — 1:1, 9 s, Construction: A safety-yellow hiring post: NOW HIRING in tall Bebas, three trades with hourly rates that count up on dashed rules, a tilted crew photo with an APPLY TODAY burst and a "DM us" pill. Edit the trades, rates and number.
- [Materials receipt](https://cutluma.com/templates/cn-materials-list) — 4:5, 10 s, Construction: A till receipt on concrete grey: job number, seven material lines with quantities and prices that count up, subtotal, delivery and a big total, a barcode and a red ORDERED stamp. Swap in your own order.
